Selected work by Amanda Harris:

  • Mugarinya Community Inc.

    Harris, A. (Dec 2023). Community Values Consultation Report: Assessment of Potential Impacts on the Social and Cultural Values of Mugarinya Community due to the Revised 8B Rail Alignment through Yandeyarra Aboriginal Reserve Proposed by HanRoy Iron Ore Projects Pty Ltd Prepared for Mugarinya Community Association Inc.

  • Murujuga Aboriginal Corporation and the Department of Jobs, Tourism, Science and Innovation

    Harris, A. (Dec 2023). Site Identification Survey of the Burrup Section of the Maitland to Burrup Infrastructure Corridor, Burrup Peninsula, Western Australia . Prepared for Murujuga Aboriginal Corporation and the Department of Jobs, Tourism, Science and Innovation, Western Australia

  • Murujuga Aboriginal Corporation and Australian Gas Infrastructure Group

    Harris, A. (Dec 2023). Site Avoidance Survey of the Proposed Gas Pipeline Alignment for connection to the Perdaman Urea Plant, Burrup Peninsula, Western Australia Prepared for Murujuga Aboriginal Corporation and the Australian Gas Infrastructure Group, Western Australia.

  • Robe River Kuruma Aboriginal Corporation and RTIO

    Harris, A. (Oct 2023). Ethnographic Absence/Presence Survey within Mesa J, Mesa H and Highway / Tod Bore Project Areas of Rio Tinto Iron Ore’s Robe Valley Operations, Western Pilbara Region, Western Australia Prepared for Robe River Kuruma Aboriginal Corporation and Rio Tinto Iron Ore

  • Robe River Kuruma People and Rio Tinto Iron Ore

    Harris, A. (2023). Social Surroundings Consultation for Proposed Highway Project Area within Rio Tinto Iron Ore’s Robe Valley Operations, Pilbara, Western Australia (August - December 2023)

  • Puutu Kunti Kurruma Pinikura People and Rio Tinto Exploration

    Harris, A. (2023). Work Program Site Avoidance Survey of Exploration Areas within Tenements E47/01783 and E47/04379 of Rio Tinto Exploration Pty Ltd’s Bourne Highway and Cajuput Projects, Pilbara, Western Australia (June 2023).

  • Rottnest Island Authority and the Whadjuk Noongar People

    Brown, J., Harris, A. & Ryan, I. (2023). Report of an Aboriginal archaeological and ethnographic Site Identification survey of the Water Infrastructure Upgrade Survey Areas, Wadjemup, Western Australia.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and Main Roads Western Australia

    Harris, A. (July 2023). Work Area Clearance survey of SLK 38.6, SLK 43.8, SLK 54, SLK 72, SLK 164, SLK 194.2 and SLK 201 located along the Minilya-Exmouth Road, and SLK 660 located along the North West Coastal Highway, Gascoyne Region, Western Australia.

  • Budina Aboriginal Corporation RNTBC and Dreadnought Resources Ltd

    Harris, A. (August 2023). Work Area Clearance survey of proposed exploration drilling areas within tenements E09/2370 and E09/2384 on Lyndon and Mangaroon Stations, Budina Country, Western Australia.

  • Jamukurnu-Yapalikurnu Aboriginal Corporation and IGO Limited

    Harris, A. (July 2023). Work Program Clearance Survey within Exploration Tenements E45/2772, E45/2771, E45/3574, E45/5300, E45/2415, E45/2280, E45/4862 and E45/3575 of IGO’s Paterson Exploration Project, Great Sandy Desert, Western Australia

  • Jurruru Aboriginal Corporation RNTBC and Norwest Minerals Ltd.

    Harris, A. (Sept 2023). Work Area Clearance Assessment of Exploration Areas within Tenement E08/2894 of Norwest Mineral’s Bali Copper Project, Pilbara, Western Australia.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and Horizon Power

    Harris, A. (May 2023). ETHNOGRAPHIC CULTURAL HERITAGE ASSESSMENT REPORT: Work Area Clearance Survey for the Exmouth Power Project within Lots 505 (DP 64832) and 550 (DP 72929), Cape Range Peninsula, Western Australia.

  • Robe River Kuruma Aboriginal Corporation and Rio Tinto Iron Ore

    Harris, A. (November 2023). Ethnographic Presence/Absence Survey within Mesa J, Mesa H and Highway / Tod Bore Project Areas, Rio Tinto Iron Ore’s Robe Valley Operations, Western Pilbara Region, Western Australia.

  • Robe River Kuruma People and RTIO

    Dortch, J & Harris. A (Feb 2023). Review of cultural heritage assessments and related documents at 20 Aboriginal heritage sites, Robe River area, Pilbara, Western Australia.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and MRWA

    Harris, A. (Mar 2023). Ethnographic Cultural Heritage Assessment Report: Site Identification Survey over Minilya Exmouth Rd Area C SLK 201.04-211.75, Material Pits SLK 2, 10.5, 13.2 and 18.3 and Water Bore Area SLK 35.7; North West Coastal Highway Parking Bay Upgrade SLK 526.6; North West Coastal Highway SLK 655 Material Pits, Gascoyne Region, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Nganhurra Thanardi Garrbu Aboriginal Corporation and Main Roads Western Australia.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and Horizon PowerItem

    Harris, A. (2023). Ethnographic Cultural Heritage Assessment: Site Avoidance Survey for the Exmouth Power Project within Lots 505 (DP 64832) and 550 (DP 72929), Cape Range Peninsula, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Nganhurra Thanardi Garrbu Aboriginal Corporation and Horizon Power.

  • Robe River Kuruma People and RTIO

    Harris, A. (2023). Detailed Ethnographic Site Assessment Survey of Mesa J Rail Bridge 15 (ML248SA Sec 104) and Site Avoidance Survey for Warramboo Tailings Storage Facility (ML248SA Sec 108 and 100) and Todd Bore (E08/01196) within Rio Tinto’s Robe Valley Operations, Western Pilbara Region, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and Rio Tinto Iron Ore.

  • Robe River Kuruma People and RTIO

    Harris, A. (April 2023). Ethnographic Field Review of Previous s18 Assessed Heritage Sites on Mesas C, H and K within Rio Tinto’s Robe Valley Operations, Pilbara, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and Rio Tinto Iron Ore.

  • Robe River Kuruma Aboriginal Corporation and API Management Pty Ltd.

    Harris, A. (Nov 2022). Work Area Clearance Survey within Tenements E47/1283, E47/1280, E47/1255 and E47/1256 of API Management Pty Ltd’s Exploration X355ae and X336ae Projects, Western Pilbara, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and API Management Pty Ltd

  • Murujuga Aboriginal Corporation and Yara Fertilisers

    Harris, A. (Dec 2022). Aboriginal Ethnographic Heritage Assessment of Procedural Breach by Yara Fertilisers Pty Ltd.

  • Jamukurnu-Yapalikurnu Aboriginal Corporation and IGO Limited

    Harris, A. (Sept 2022). Ethnographic Cultural Heritage Assessment Report: Work Program Ethnographic Assessment within Exploration Tenements E45/2415, E45/2771, E45/2772, E45/2773, E45/3573, E45/5300, M45/1111, E45/1110 of IGO’s Paterson Exploration Project, Great Sandy Desert, Western Australia. Prepared for Jamukurnu-Yapalikurnu Aboriginal Corporation and IGO Limited

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and the Department of Transport, Western Australia

    Harris, A. (Dec 2022). Ethnographic Cultural Heritage Assessment Report: Site Identification Level Ethnographic Survey of Tantabiddi Midden 1 and Tantabiddi Sinkhole, Cape Range Peninsula, Gascoyne Region, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Nganhurra Thanardi Garrbu Aboriginal Corporation and the Department of Transport, Western Australia

  • Murujuga Aboriginal Corporation and Bechtel

    Harris, A. (Dec 2022). Ethnographic Cultural Heritge Report: Assessment of potential impact to previously identified Aboriginal Sites from proposed widening and re-purposing of the roads from Pilbara Port Authority to Woodside’s Pluto LNG Park, Burrup Peninsula, Western Australia. Prepared for Murujuga Aboriginal Corporation and Bechtel Western Australia.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and the Department of Transport, Western Australia

    Harris, A. (Dec 2022). Ethnographic Cultural Heritage Assessment Report: Site Identification Ethnographic Survey of Tantabiddi Midden 1 and Tantabiddi Sinkhole, Cape Range Peninsula, Gascoyne Region, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Nganhurra Thanardi Garrbu Aboriginal Corporation and the Department of Transport, Western Australia

  • Murujuga Aboriginal Corporation and Bechtel Western Australia

    Harris, A. (Dec 2022). Ethnographic Cultural Heritage Assessment Report: Assessment of potential impact to previously identified Aboriginal Sites from proposed widening and re-purposing of the roads from Pilbara Port Authority to Woodside’s Pluto LNG Park, Burrup Peninsula, Western Australia. Prepared for Murujuga Aboriginal Corporation and Bechtel Western Australia.

  • Murujuga Aboriginal Corporation and Yara Fertilisers

    Harris, A. (Dec 2022). Ethnographic Cultural Heritage Impact Assessment of Procedural Breach. Prepared for Murujuga Aboriginal Corporation and Yara Fertilisers, Burrup Peninsula.

  • Murujuga Aboriginal Corporation and Horizon Power

    Harris, A. (Sept 2022). Ethnographic Cultural Heritage Assessment Report: Site Avoidance Survey of Horizon Power’s Burrup Transmission Line Project, Burrup Peninsula, Western Australia. Prepared for Murujuga Aboriginal Corporation and Horizon Power

  • Robe River Kuruma Aboriginal Corporation and Mineral Resources Ltd.

    Harris, A. (Oct 2022). Work Program Ethnographic s18 Survey (additional Overburden Stockpile Area and ANFO Storage Facility); s18 Review Consultation (previously surveyed Ken’s Bore Mine area); Boundary Assessment of “Kangaroo Trap Pool”; and Consideration of “Sarah’s Cave” within Tenements M08/480-1, M08/0484 and G08/86 of Mineral Resource Limited’s Onslow Iron Project, Western Pilbara, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and Mineral Resources Limited

  • Robe River Kuruma Aboriginal Corporation and Mineral Resources Ltd.

    Harris, A. (Oct 2022). Ethnographic Cultural Heritage Assessment Report: Work Program Site Identification Survey (Haul Road and Gas Pipeline Corridors) and Site Avoidance Survey (Geotech Areas, Hydro Drilling Targets and Access Tracks) within Tenements M08/0484, L08/0199, L08/220, L08/232 and L08/231 of Mineral Resource Limited’s Onslow Iron Project, Western Pilbara, Western Australia Prepared for Robe River Kuruma Aboriginal Corporation and Mineral Resources Limited.

  • The Malarngowem People, East Kimberley

    Harris, A. (2022). Work Program Ethnographic Assessment of Exploration Drill Holes within Tenements E80/3096, E80/3864 and E80/4733 of Hexagon Energy Materials Ltd’s McIntosh Project, East Kimberley, Western Australia. Prepared for Environmental Heritage Social Impact Services Pty Ltd., the Malarngowem Native Title Determination Group and Hexagon Energy Materials Ltd.

  • Nganhurra Thanardi Garrbu Aboriginal Corporation and Cape Range Peninsula

    Harris, A. (2022). Work Area Clearance Ethnographic Assessment of the Tantabiddi Boating Facility Project Area within Jurabi Coastal Park (Reserve 40729), Cape Range Peninsula, Gascoyne Region, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Nganhurra Thanardi Garrbu Aboriginal Corporation and the Department of Transport, Western Australia

  • The Martu, Great Sandy Desert, and Antipa Minerals Ltd.

    Harris, A. (2022). Work Program Ethnographic Assessment within Tenements of Antipa Minerals Ltd’s Wilki Project, Great Sandy Desert, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Western Desert Lands Aboriginal Corporation RNTBC and Antipa Minerals Limited, Western Australia.

  • Murujuga Aboriginal Corporation, Burrup Peninsula, Western Australia

    A. Harris. (2022). Ethnographic Assessment Report: Site Identification assessment of land designated for an above-ground water pipeline to support Woodside Energy Ltd’s Pluto Train 2 Project on the Burrup Peninsular, Pilbara, Western Australia. Prepared for Murujuga Aboriginal Corporation and Bechtel Western Australia

  • Jurruru People, South West Pilbara

    A. Burcham & A. Harris. (2022). Archaeological and Ethnographic Heritage Assessment Report: Work Area Clearance Assessment within Tenement E08/2984 of Norwest Mineral’s Bali Copper Project, Pilbara, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, the Jurruru People and Norwest Minerals Ltd.

  • Ngururrpa People, East Pilbara

    M. Mrvelj & A. Harris. (2022). Report of an Ethnographic Work Program Survey of Encounter Aileron Pty Ltd’s Exploration Tenement E80/5469 within the Ngururrpa Native Title Determination, Western Australia. Prepared for the Parna Ngururrpa Aboriginal Corporation RNTBC and Central Desert Native Title Services Ltd.

  • Robe River Kuruma Aboriginal Corporation

    A. Harris & V. Winton. (2021). Review of previously assessed Robe River Kuruma Aboriginal Heritage Sites subject to section 16 and/or 18 applications by Rio Tinto Iron Ore. Prepared for Robe River Kuruma Aboriginal Corporation.

  • Bungaroo Creek and the Robe River Kuruma People

    A. Harris. (2021). Ethnographic Heritage Assessment and Review of Heritage Management Strategies for the Bungaroo South Mine Project Area within Mineral Resources Ltd’s Ashburton Project, Pilbara, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and Mineral Resources Limited.

  • Western Desert Lands Aboriginal Corporation

    A. Harris (2021). Gap Analysis and Review of the Draft Haverion Project Aboriginal Cultural Heritage Risk Assessment and Cultural Heritage Management Plan of Newcrest Mining Ltd. Prepared for Western Desert Lands Aboriginal Corporation.

  • Kumina and Bungaroo South Projects

    A. Harris. (2021). Ethnographic Heritage Assessment of Proposed Kumina Bungaroo South Haul Road within Mineral Resources Ltd’s Ashburton Project, Pilbara, Western Australia. Prepared for Robe River Kuruma Aboriginal Corporation and Mineral Resources Limited.

  • PKKP Aboriginal Corporation

    A. Harris. (2021). Work Area Clearance Ethnographic Assessment of Exploration Areas within M47/1567, E47/3506, E47/1154 and E47/2292 of Fortescue Metals Group’s Eliwana Project, Pilbara, Western Australia. Prepared for PKKP Aboriginal Corporation, the Pinikura People and Fortescue Metals Group.

  • Western Desert Lands Aboriginal Corporations

    A. Harris. (2021). Review of Section 18 Applications by Reward Minerals Ltd pertaining to Lake Disappointment. Prepared for Western Desert Lands Aboriginal Corporation.

  • Martu People, Western Desert, Pilbara

    A. Harris. (2021). Work Area and Program Clearance Ethnographic Heritage Assessment of Proposed Drill Holes and Access Tracks within Paterson Resources Limited’s Grace Project, Pilbara, Western Australia. Prepared for Yamatji Marlpa Aboriginal Corporation, Western Desert Lands Aboriginal Council and Paterson Resources Ltd.

  • Martu People and Antipa, Western Desert, Pilbara

    A. Harris. (2021). Ethnographic Work Program Clearance Heritage Assessment within the Wilki Project of Antipa Minerals, Western Desert, Western Australia. Prepared for Western Desert Lands Aboriginal Corporation, Martu Traditional Owners and Antipa Minerals Ltd.

  • Yugunga-Nya Traditional Owners and Australian Vanadium

    A. Harris & S. Harper. (2021). Ethnographic and Archaeological Heritage Assessment of EIS aircore drill lines, water drilling sites, infill blocks 50, 60 & 70, proposed main camp site and TSF test sites for the Australian Vanadium Project, Western Australia. Prepared for the Yugunga-Nya Traditional Owners and Australian Vanadium Ltd.

  • Nyamal Aboriginal Corporation and Sipa Resources

    A. Harris. (2021). Ethnographic Assessment of proposed air-core drilling program and access tracks within the Warralong Project of Sipa Exploration NL, Pilbara, Western Australia. Prepared for the Nyamal Aboriginal Corporation and Sipa Resources Ltd.

  • Wanparta Pty Ltd and Pardoo Beef Corporation

    A. Harris & J. Dortch. (2020). Heritage assessment of Agricultural Lots within Pardoo Beef Corporation Pty Ltd’s Development at Pardoo Station, Pilbara, Western Australia. Prepared for Wanparta Pty Ltd and Pardoo Beef Corporation Pty Ltd.

  • Wajarri Yamaji People and CSIRO

    A. Harris & G. Wright. (2020). Ethnographic Heritage Report, Site Avoidance Heritage Assessment CSIRO SKA1-Low Telescope, Kalli Station, Murchison Region, Western Australia. Prepared for Ethical Engagement Consultancy and CSIRO.

  • Kariyarra Aboriginal Corporation and Novo Resources

    A. Harris & G. Wright. (2020). Site Avoidance Ethnographic Heritage Assessment for Novo Resources Corp / Farno-McMahon in Tenements E47/3812, E47/3738, E473321 and E47/3318 within the Egina Project, Pilbara, Western Australia. Prepared for Kariyarra Aboriginal Corporation and Novo Resources Corp / Farno-McMahon

  • Kariyarra Aboriginal Corporation and Fortescue Metals Group

    A. Harris (2020). Site Avoidance Heritage Assessment Fortescue Metals Group Limited Iron Bridge Magnetite Project, Pilbara, Western Australia Ref: HFN1779(KAR)/2020_KAR_Trip3. Prepared for: Kariyarra Aboriginal Corporation and Fortescue Metals Group Limited.

  • Kariyarra Aboriginal Corporation and the Iron Bridge Magnetite Project

    A. Harris (2020). Site Avoidance Heritage Assessment Fortescue Metals Group Limited Iron Bridge Magnetite Project, Pilbara, Western Australia Ref: HFN1786(KAR)/2020_KAR_Trip4. Prepared for Kariyarra Aboriginal Corporation and Fortescue Metals Group Limited. September 2020.

  • Kariyarra Aboriginal Corporation and Mineral Resources Ltd

    A. Harris & G. Wright. (2019). Mineral Resources Limited Wodgina Lithium Project Work Area Heritage Review within Exploration Area (M45/365-1), Eastern Waste Landform Expansion Area (M45/50-1 and M45/383-1) and Tailings and Storage Facility 4 Area (M45/923-1). Prepared for the Kariyarra Aboriginal Corporation for discussion with Mineral Resources Ltd.

  • Genealogical research for the Kariyarra Aboriginal Corporation (several reports)

    A. Harris & G. Wright. (2019). Kariyarra Membership Report: The [name removed] Family. Prepared for the Kariyarra Aboriginal Corporation.

  • Kariyarra People and Atlas Iron's Wodgina Project

    A. Harris & G. Wright, Work Area Heritage Assessment, Atlas Iron Limited’s Proposed Hercules Resource and Infrastructure Areas (Wodgina Project Stage III), Pilbara, Western Australia. Prepared for Atlas Iron Pty Ltd,

  • Metropolitan Area Indigenous Groups and Landcorp

    A. Harris, G. Wright. Metropolitan Area Indigenous Groups, Landcorp Baldivis Development. Prepared for Strategen on behalf of Landcorp.

  • Metropolitan Indigenous Groups and Capital Square Development, Perth

    A. Harris & G. Wright, Ethnographic Survey: Capital Square Development, City of Perth. Prepared for AAIG Pty Ltd.

  • Midgegooroo Execution and Burial and the Anglican Church, Perth

    A. Harris & G. Wright. Ethnographic Heritage Survey Report: DIA Site 29278 - Midgegooroo Execution and Burial Metropolitan Area Indigenous Groups. Prepared for Heritage Link/Anglican Church – Diocese of Perth, Report and Addendum to Report.

  • Metropolitan Area Indigenous Groups Fremantle Rail Bridge Protection Projec

    A. Harris, Wright, G. & Hemmers, C. Ethnographic Heritage Assessment Metropolitan Area Indigenous Groups Fremantle Rail Bridge Protection Project. Prepared for Fremantle Ports, 21-22 August.

  • Kariyarra People and the Mt Dove Project

    D. Harris, Reynen, W. & Harris A., Archaeological and Ethnographic Heritage Survey Report: Work Area Heritage Assessment, Atlas Iron Limited’s Proposed Mt Dove Mining Operations, Pilbara, Western Australia. Prepared for the Kariyarra Native Title Group and Atlas Iron Ltd.

  • Kariyarra People and Atlas Iron's Wodgina Project

    R. Cameron & A. Harris. Work Program Heritage Assessment of proposed Communication Tower at Atlas Iron Limited Wodgina Mine Site, Pilbara, Western Australia. Prepared for the Kariyarra Native Title Group and Atlas Iron Ltd.

  • Metropolitan Area Indigenous Groups and the Perth Waterfront Project

    A. Harris & G. Wright. Ethnographic Heritage Consultation: Metropolitan Area Indigenous Groups, Perth Waterfront Project Phase 3, Final Report. Prepared for the Government of Western Australia Department of Planning.

  • Dampier Highway Duplication Project and AECOM

    A. Harris & G. Wright. Consolidated Report of Ethnographic and Archaeological Surveys of the Dampier Highway Duplication Project. Prepared for AECOM on behalf of Main Roads Western Australia and Department of Environment, Water, Heritage and the Arts.

  • Metropolitan Area Indigenous Groups and Perth Airport

    A. Harris & G. Wright. Ethnographic Survey: Proposed aviation infrastructure development at Perth Airport, Metropolitan Area Indigenous Groups. Prepared for Westralia Airports Corporation.

  • Metropolitan Area Indigenous Groups and Redcliffe Site Development, Perth Airport

    A. Harris & G. Wright. Report of an ethnographic survey of a proposed development site in Redcliffe at Perth Airport: Metropolitan Area Indigenous Groups Heritage Consultations. Prepared for Perth Airport.

  • Aircraft Viewing Platform at Perth Airport and Metropolitan Area Indigenous Groups

    A. Harris & G. Wright. Proposed Tonkin Slip Road and Aircraft Viewing Platform at Perth Airport, Metropolitan Area Indigenous Groups. Prepared for Westralia Airports Pty Ltd.

  • Ngarlawangga Native Title Claim Group and BHP Billton

    A. Harris & G. Wright. Ethnographic Report, Work Area Clearance – Mudlark - Mining Area C Ngarlawangga Native Title Claim Group/Yamatji Marlpa Aboriginal Corporation. Prepared for BHP Billiton Iron Ore.

  • Arts Precinct Development, University of Western Australia and Metropolitan Area Indigenous Groups

    A. Harris & G. Wright. Arts Precinct Development, University of Western Australia: Metropolitan Area Indigenous Groups Heritage Consultations. Prepared for the University of Western Australia.

  • JoJo’s Marina, Nedlands and Metropolitan Area Indigenous Groups

    G. Wright & A. Harris. Indigenous Heritage Survey, Metropolitan Area Indigenous Groups, JoJo’s Marina, Nedlands - Marina Redevelopment. Prepared for JoJo’s Marina.

  • Nyangumarta Warrarn Aboriginal Corporation and Sipa Exploration

    A Harris. Ethnographic Heritage Assessment of proposed geophysical survey tracks and access tracks within the Paterson North Project of Sipa Exploration NL, Pilbara Region, Western Australia.

  • Mundijong Road Desktop Study

    A. Harris & G. Wright. Desktop study – Preliminary Investigation of Aboriginal Heritage - Mundijong Road. Prepared for Main Roads WA.

  • Aboriginal Mental Health Worker Program Evaluation

    A. Harris & G. Robinson. Final Evaluation Report of the Aboriginal Mental Health Programme, beyondblue inc., and the Cooperative Centre for Aboriginal Health.

  • Report to Yan Bian County, Sichuan Province, China on Maternal Health Care Services

    A. Harris, Zhou Yun, Liao Hua, L. Barclay, Zeng Wei Yue. Challenges to maternal health care utilisation among ethnic minority women in a resource poor region of southern Sichuan Province, China. Report for the Bureau of Health, Yan Bian County, Sichuan Province, China. (English and Mandarin).

  • Kangeta Day Care Centre Project, Kenya

    A. Harris, Evaluation Report for the Kangeta Day Care Centre Project, Kenya. Prepared for Be Kids Australia Inc.

  • Kengele Children’s Network Project, Korogocho, Kenya

    A. Harris, Evaluation Report for the Kengele Children’s Network Project, Korogocho, Kenya. Prepared for Be Kids Australia Inc.

  • Indigenous minorities and birth policies, China

    A. Harris, Yu Gao, L. Barclay, S. Belton, Zeng Wei Yue, Hao Min, Xu Aiqun, Liao Hua, Zhou Yun, Consequences of Birth Policies and Practices in Post-Reform China. Reproductive Health Matters, November 2007, Vol. 15, No. 30

  • Indigenous birth practitioners, Sichuan Province, China

    A. Harris, S. Belton, L. Barclay & J. Fenwick, From Jie Sheng Po to Zhu Chan Shi: transformations in the practice, power and place of midwifery in China. Midwifery [Epub ahead of print], doi:10.1016/ j.midw.2007.1001.1015.

  • Traditional Healing in Iban Longhouses, Sarawak

    A. Harris. Childbirth and Traditional Healing in an Iban Longhouse. in The Daughters of Hariti: Birth and Female Healers in South and Southeast Asia, ed. S. Rozario and G. Samuel, Gordon & Breach.

  • Presence, Efficacy and Politics in Healing among Iban Communities, Sarawak

    A. Harris. Presence, Efficacy and Politics in Healing among Iban Communities in Sarawak. in Healing Powers and Modernity: Traditional Medicine, Shamanism and Science in Asian Societies, ed. L. Connor and G. Samuel, Bergin & Garvey.

  • Indigenous healers and political agendas, Sarawak

    A. Harris. Remedy for an “Ailing Race”: Elite agendas and shamanic visions. In Special Issue of Review of Indonesian and Malaysian Affairs, vol. 33, no.1.